Lorax Kitchen

  • The Lorax kitchen, after a deep cleaning, was painted and had a new floor installed in the summer of 2006.
  • The stove venting and the stove itself was pressure washed/degreased in the summer of 2006.
  • A pressure cooker and industrial blender were purchased in the summer 2006.
  • The pressure cooker was repaired in the winter of 2007.
  • An industrial food processor was purchased in the winter of 2007.
  • A new commercial dishwasher/sanatizer was installed in the winter of 2007.
  • A new faucet was installed 4/2007
  • A new double oven range was installed in winter 2011
Comments